-
Hany SamyI do not find what I can say and I do not know how to thank you. It was a great week with you and it was one of the best times I ever had. your boss is excellent and the factory is very good I'll miss you all I miss you so much Thank you Hany samy
-
HazelThank you very much for the training and for being generous hosts. We have learned a lot and will be putting our knowledge into good use. Regarding the specs for our sample model, we’ll get back to you once we have gathered more information. Again, thank you for accommodating us in the training J
-
WenThanks for the hospitality during our visit to your company. We are waiting for your revise offer with inclusive shipping cost. Thanks.
UL / FM Horizontal Split Case Pump Assembly Skid Mounted Fire Pump Package
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xBrand | Eaton | Function | Control Panel For Fire Pump |
---|---|---|---|
Starting Type | Wye Delta Starting, Soft Starting, Transformer Starting | Protection Grade | IP54 |
Color | Red | Standard | NFPA20 / UL / EN12845 |
High Light | jockey pump controller,fire pump control panel,FM Horizontal Fire Pump Package |
UL / FM Horizontal Split Case Pump Assembly Skid Mounted Fire Pump Package
NM package fire pump system consists of pumps, driver, controllers and accessories mounted on a common base frame.
High quality UL / FM certified components are used in these systems complying with the requirements of NFPA 20. All
necessary wiring between controllers and drivers are done at factory prior to shipment. The automatic air release valve,
casing relief valve, suction gauge & discharge gauge are mounted on fire pumps and other accessories are mounted on
pre-constructed interconnecting piping as required by NFPA 20. Pressure sensing lines are pre-installed on Electric, Diesel,
and Jockey Controllers as per NFPA 20 requirements.
These systems are subjected to rigorous performance tests at factory as per UL, FM & NFPA standards to ensure proper
performance of the system as per the design requirements. For completing the installation of these pre-engineered 'ready to
install' packages the installing contractor only needs to grout the structural base, connect the suction & discharge pipes and
incoming power.
Main Parameters:
Rated Flow | 1000 GPM |
Rated Head | 102psi |
Pump : NM Fire (UL/FM ) | SCF150-125-250 |
Casing | Ductile Cast Iron |
Impeller | SS304 |
Shaft | AISI 4340 |
Shaft sleeve | SS304 |
Seal | Gland Packing |
Wear Ring | Bronze |
Bearing | SKF |
Motor: Techtop (UL) | TDC365TS100U2B |
Control Panel: Eaton (UL/FM) | FD70-100-J-L1 |
Application:
Industrial fields: All petroleum, petrochemical, chemical, oil fields, pipelines bureaus, oil repositories, oil terminals, oil refineries, offshore platforms, etc.; National grain storages, thermal power plants, steel plants, shipyards, paper mills, etc.;
Commercial Field: five-star hotels, hospitals, schools, supermarkets, office buildings, large-scale commercial complex, highway tunnels, subway stations, railway stations, airports; Fire-fighting Engineering Companies;
Service:
Pre-service |
Introduce the product to the customer in detail,answer the question raised by customer carefully; |
Sale service |
1. Ensure product with high quality and pre-commissioning before delivery; |
2. Delivery on time; |
3. Provide full set of documents as customer’s requirements. |
After-sale service |
Provide considerate services to minimize clients’ worries. |